System information
-
Ticket based support at Lunarc
-
2005-10-25 Network Problems on Docenten
- A bad driver for the network cards on Docenten nodes is causing job failures
-
2005-10-28 Dual Nodes on Docenten
- 10 nodes on Docenten have two processors and jobs can now be schededuled to run on both.
-
Updated Compilers
- New modules for the Intel compilers version 9.0 and for the Portland Group compilers version 6.1 have been added on Toto7, Sigrid, and Docenten.
-
SIGRAD 2005: Mobile Graphics
- 23-24 November SIGRAD'05 conference at Kårhuset and IKDC
-
New SMP Resource
- The new smp machine, sweet16.lunarc.lu.se, is now available for lunarc users.
-
Lunarc Användarmöte
-
Whenim64 Joins Toto7 Again
- The nodes from Whenim64 are back in the joint Toto7/Whenim64 queue, but the Toto7 part is not entirely healthy.
-
2005-11-25 New Disk Quotas on Docenten
- Disk quotas have been set to 20 GB per user for /disk/global1 and /disk/global2 on Docenten. Users exceeding this limit have a week to reduce their disk usage or ask for a larger quota before writing will become impossible.
-
New lunarc switch
-
New Newsletter
- A new newsletter is available.
-
Toto7 Reduced
- The Toto7 nodes with bad disk performance have been removed from the batch system, because there are also problems with normal operations related to the lower performance.
-
System maintainance Toto7/Whenim64
(LDC, from
Mar 27, 2006 08:00 AM to
Mar 31, 2006 04:00 PM)
- Toto7 and Whenim64 will be upgraded from RH7.3 to CentOS 4.2. Two new fileservers will also be installed, serving /disk/global1 and /disk/global2
-
Toto7 Ready
- The upgrade of Toto7 is ready and can be used again.
-
Sweet16 Maintenance
-
Sweet16 Scheduled Stop
- Sweet16 will be unavailable June 7-9, because of maintenance.
-
Sweet16 maintainance
(LDC, from
Aug 31, 2006 08:00 AM to
Sep 01, 2006 04:00 PM)
- Sweet16 will be down for maintainance thursday through friday.
-
Sigrid maintenance
(LDC, from
Jun 12, 2006 08:00 AM to
Jun 16, 2006 05:00 PM)
- Sigrid will be down for maintenance from 12/6-16/6.
-
Sweet16 maintenance
(LDC, from
Jun 07, 2006 08:00 AM to
Jun 09, 2006 06:00 PM)
- Sweet16 will be unavailable due to maintenance 7/6-9/6.
-
Sigrid upgrade complete
-
Sweet16 Maintenance
(from
Nov 01, 2006 08:00 AM to
Nov 01, 2006 05:00 PM)
- Sweet16 will be unavailable. Queued jobs will be preserved.
-
Toto7 and Whenim64 retired
-
Sigrid unplanned outage
-
IBM levererar beräkningskluster till Lunds universitet och Chalmers tekniska högskola
-
Sigrid Maintenance
-
ARC grid client installed on Docenten
-
Sweet16 Maintenance
(from
Nov 16, 2006 08:00 AM to
Nov 16, 2006 05:00 PM)
- Sweet16 will be unavailable. Queued jobs will be preserved.
-
Sigrid storage problems
-
Sigrid update complete
-
Problems with Sigrid file server
-
Sweet16 Maintenance
-
The course "Parallel Programming Techniques " has been postponed until April
- The lecturers from Umeå has been forced to move the start of this course from the announced dates (2007-02-12) to the start of April. Exact dates will be announced later.
-
Sigrid fileserver problems
-
Docenten network failure
- Half of Docenten was temporarily unreachable due to a combined failure of switches and nodes.
-
Sweet16 Maintenance
- On Wednesday 2007-01-17, Sweet16 will be unavailable due to maintenance.
-
New System Available
- The new system Milleotto is now open for Lunarc users.
-
Problems with Sigrid solved
-
Disk full on Sigrid during the weekend
-
Milleotto /disk/global hanging
- Individual directories in the tree of /disk/global on Milleotto are not responding and any processes operating on these directories are hanging.
-
Planned Shutdown of Docenten 27/3
- On Tuesday March 27, Docenten will be taken out of service for some hours.
-
Storage system malfunction
-
Sigrid available again
-
Sigrid file server problems
-
Sigrid DOWN
-
Login temporarily unavailable
- The login server will be temporarily shutdown in the morning of Friday March 30.
-
Milleotto /disk/global unreachable
- The problems with /disk/global on Milleotto have returned.
-
Clusters back to normal
- The cooling system at the computer centre is working again and the cluster nodes are up and running.
-
/disk/global back, jobs gone
- The problems with /disk/global on Milleotto have been fixed for now, but at a cost.
-
Sweet16 Unavailable
- All Sweet16 nodes have been sent to the supplier for repair.
-
Cooling System Down
- The cooling system at the computer centre has unexpectedly stopped working and the Lunarc systems have been powered off.
-
/disk/global back, jobs gone (again)
- /disk/global on Milleotto has been restored, but at the cost of most jobs
-
New Milleotto /disk/global hang
- /disk/global on Milleotto has been hung again and releasing it caused the loss of many jobs.
-
Milleotto queue temporarily stopped
- The queue on Milleotto has been stopped to prevent damage to oncoming jobs during a node-by-node cleanup of /disk/global.
-
Milleotto is back in service
-
Milleotto is back to normal
-
Milleotto login node down
-
SNAC survey
-
Milleotto queue corrupted
- Queue-system clients on many Milleotto nodes have been corrupted.
-
Parallel Problems on Milleotto
- Pass-thru modules keep failing, killing parallel jobs, but a solution is in sight.
-
New Version of MKL
- Version MKL 10.0 is available, but not default.
-
Massive communication failure on Milleotto
- No less than four pass-thru modules have failed since yesterday, affecting many parallel jobs
-
Docenten Maintenance Postponed
- The previously announced maintenance will take place at a later date
-
Exchange Completed on Milleotto
- All remaining old pass-thru models have been replaced with new ones
-
Milleotto Maintenance March 4-6
- Milleotto will be unavailable March 4-6 due to maintenance.
-
Slow Communications
- A communication problem has occured affecting all Lunarc systems
-
Communication Problem Solved
- The root of the problem was indeed a failed firmware update for a blade-center switch
-
Milleotto Maintenance Extended
- Unfortunately, the maintenance of Milleotto has to be extended to the morning of March 7.
-
Milleotto Back Again
- The maintenance of Milleotto is now complete.
-
Docenten Maintenance
- Docenten, including /disk/global1 and /disk/global2, will be unavailble from May 23 and possibly until May 30.
-
Docenten Is Back
- The maintenance of Docenten is finished and normal operations have been resumed
-
Network Down
- The network to Milleotto and Siri is down, which also affects Docenten.
-
Docenten Workaround
- A workaround has been implemented to stop Docenten from hanging on login during the network outage of Milleotto and Siri
-
Network Up
- Milleotto and Siri can talk to the world again
-
Milleotto Internal Network Hang
- Several nodes within Milleotto lost their network due to a problem with the DHCP server
-
Slow Response on /disk/global
- /disk/global om Milleotto has very long response times recurringly
-
Docenten to be Decommissioned
- Docenten will be shutdown permanently on February 16, 2009.
-
Docenten Permanently Unavailable
- Docenten is no longer available for running jobs
-
Milleotto Maintenance
- As previously announced, Milleotto has been made unavailable until Monday 23/3 17.00.
-
Scheduled Powercut
- The Lunarc systems will be unavailable on April 28-29.
-
Milleotto /disk/global full
- The maximum number of files on the filesystem was reached intermittently
-
Milleotto - job submission problem fixed
- A file system error caused job submission to fail.

